Command in Sync LogoCommand in Sync
Concrete yield and ACI 138 short load QC calculator icon

Concrete Yield Estimator

Parametric cubic yardage, ACI 138 yield verification, and raw material takeoffs.

01. Slab Dimensions

Define the baseline geometric volume of the pour before contingencies.

02. Displacement & Logistics

Deduct the exact cubic yardage displaced by the steel matrix and calculate pacing.

03. ACI 138 Field QC Module

Verify delivery batch weights against tested unit weights to audit short loads.

Total Purchase Order VolumeArea: 5,000 sq ft

97.2 CY

Gross Form Volume

92.6 CY

Net Yield

92.6 CY

Waste / Contingency (5%)

+ 4.6 CY

ACI 138 Truck Yield Validation

10.00 CY / TRUCK

1.029 REL YIELD

10

Trucks

2.0

Trk / Hr

4.9

Hours

Raw Mix Components (1:2:4)

21.4

Cement (CY)

42.8

Sand (CY)

85.6

Gravel (CY)

Flatwork Ancillaries

6-Mil Poly (20x100)

3 Rolls

Wire Mesh (w/ Overlap)

112 Sheets

Enterprise Telemetry

  • Track real-time ready-mix dispatch.
  • Reconcile digital delivery tickets.
  • Procore ERP yield integration.