Determine precise loose haul-off volumes factoring soil swell, pipe displacement, and backfill logic.
12.1 LCY
In-Ground Trench Vol
66.7 BCY
Structural Displacement
- 10.27 BCY
Soil Swell Expansion
+18%
Haul Manifest Requirements
1 LOADS
Stagger Rate
Every 0 mins
Displacement Matrix (Bank Yards)
1.94 CY
Pipe Subtraction
8.33 CY
Bedding Subtraction